PROJECT ZABSIB SIBUR /TECHNIP

Thyssenkrupp has asked us, for their project ZAPSIB-2 SIBUR, to design and construct 46 complex sampling systems that would be installed in Tobolsk in western Siberia (Russia).

We have been able to deliver solutions that were suitable for the extreme climatic conditions that occurs in this part of Russia. As the instrumentation and analysis are subject to particularly low temperatures (-52°C), most of the material usually used had to be customized.